Home
last modified time | relevance | path

Searched refs:finished (Results 1 – 10 of 10) sorted by relevance

/rk3399_ARM-atf/plat/intel/soc/agilex5/soc/
H A Dagilex5_cache.S80 cbz x11, finished /* if loc is 0, exit */
106 finished: label
/rk3399_ARM-atf/docs/design_documents/
H A Ddtpm_drivers.rst35 PCR extend and read, and release the locality when finished.
/rk3399_ARM-atf/docs/plat/
H A Drpi3.rst181 Once BL31 has finished and the primary core has jumped to the BL33 payload, it
/rk3399_ARM-atf/docs/components/
H A Dexception-handling.rst468 to the caller only when the Secure world has finished serving the request.
H A Dsecure-partition-manager-mm.rst627 signals the Secure Partition has finished its initialisation. Once the
H A Drmm-el3-comms-spec.rst82 back to EL3. After the RMM has finished the boot process, it can only be
/rk3399_ARM-atf/docs/design/
H A Dinterrupt-framework-design.rst749 When the Secure Payload has finished handling a Secure-EL1 interrupt, it could
H A Dfirmware-design.rst2598 has finished and be used for runtime data.
/rk3399_ARM-atf/docs/
H A Dporting-guide.rst3610 finished. The id should be the same as the id returned by the
H A Dchange-log.md12250 failed or when the execution of the image finished.