Lines Matching refs:operation
2720 decide when to regenerate the keys if generating them is an expensive operation.
2983 state coordination during a power management operation. The function is passed
3038 platform wants to support, the associated operation or operations in this
3041 function in a platform port, the operation should be removed from this
3089 needs to perform power management operation corresponding to the local state
3134 the ``pwr_domain_off()`` operation. It encodes the platform coordinated
3136 power domain levels. The handler needs to perform power management operation
3176 operation and it encodes the platform coordinated target local power states for
3214 operation. The generic code expects the handler to succeed.
3227 the ``pwr_domain_on_finish()`` operation. The generic code expects the platform
4127 NOTE: The error code -EAGAIN is not treated as an error, it means the operation